This list includes:
- Inspections which have been completed for which a report is being prepared
- Inspections which have been announced for which planning is underway
- Inspections which have been scheduled but not yet announced (please note, these dates may change)
An announced inspection for Broome Regional Prison was conducted between 15 and 19 May 2022.
A draft of the report is being prepared.
The inspection report is expected to be tabled in the first quarter of 2023.
An announced inspection of Karnet Prison Farm was conducted between 17 and 22 July 2022.
A draft report is being prepared.
The inspection report is expected to be tabled in the first quarter of 2023.
An announced inspection of Wandoo Rehabilitation Prison was conducted between 6 to 11 November 2022.
A draft report is being prepared.
The inspection report is expected to be tabled in the second quarter of 2023.
An announced inspection of Banksia Hill Detention Centre including Unit 18 at Casuarina Prison is scheduled to take place between 6 to 15 February 2023.
The inspection will assess Banksia’s progress since the regular 2020 inspection and the occasional inspection of the ISU in late 2021. We will also assess the operations of the centre’s newly established annexe at Unit 18 in Casuarina Prison. All aspects of current operations and services will be examined. All inspection work will be conducted within the framework of the Inspectorate’s Code of Inspection Standards for Young People in Detention.
The inspection report is expected to be tabled in the third quarter of 2023.
An announced inspection of Eastern Goldfields Regional Prison is scheduled to take place between 2 to 6 April 2023.
The inspection will assess Eastern Goldfields’ progress since the 2020 inspection. All aspects of current operations and services will be examined. All inspection work will be conducted within the framework of the Inspectorate’s Revised Code of Inspection Standards for Adult Custodial Services.
The inspection report is expected to be tabled in the fourth quarter of 2023.
An announced inspection of West Kimberley Regional Prison is scheduled to take place between 28 May to 2 June 2023.
The inspection will assess progress at West Kimberley since the 2020 inspection. All aspects of current operations and services will be examined. All inspection work will be conducted within the framework of the Inspectorate’s Revised Code of Inspection Standards for Adult Custodial Services.
The inspection report is expected to be tabled in the first quarter of 2024.
Page last updated: 15 Feb 2023